This entry details the recent anomalous activity detected at Site-96 on date. At approximately time, multiple staff reported experiencing unusual sensory distortions. Early analysis suggest the anomaly is centered around the research wing. A team of containment specialists has been dispatched to Site-96 and procedures are in progress. Further details will be provided as they become available.
Secure Containment Protocols: Site-96 Update
Recent occurrences at Site-96 have necessitated a review and revision of existing containment protocols. The primary concern stems from the anomalous behavior exhibited by SCP-number. This shift in behavior presents a potential threat to both personnel and the surrounding environment. To mitigate this risk, several implementations have been introduced. A new containment cell, constructed with augmented materials, has been deployed for SCP-number. Additionally, personnel rotations will be modified to minimize exposure and potential exposure. All personnel are reminded to adhere strictly to the revised protocols outlined in document designation.
- Specific protocol changes remain classified pending further analysis.
Log Log: Site 96 - Personnel Confidential
Subject Alphabetical designations remain heavily Redacted. Initial Deployment records for Agent Jones, designated as Task Force Delta lead, are Incomplete. Evidence suggests a potential Violation during the initial Contact with SCP-96. Further analysis of recovered data is required to determine the full extent of the Situation.
- Additional log entries are currently Pending for declassification review.
- Site security protocols Were/Are/Have Been implemented following the incident, including but not limited to, increased perimeter Observation, access restrictions, and mandatory De-briefings.
Their primary objective remains Site 96 containment of SCP-96 and mitigation of any Secondary effects.
Log Entry: Site-96 Breach Protocol Activated
At estimated hour:minute hours on date, a containment breach was detected at Site-96. The breach involved an anomalous entity of unknown origin and potential hazard rating. All personnel have been alerted to execute the established breach protocol, designated as "Red Level". Preliminary reports indicate heavy engagement from SCP-number and significant system damage. A full reconnaissance is underway to determine the extent of the breach and the status of all personnel. Further updates will be relayed as they become available.
Termination Authorization
This document outlines the guidelines for authorizing termination actions within Site-96. Access to this information is strictly limited to designated personnel as listed below. Any unauthorized access or dissemination of this document will result in disciplinary action.
- Authorized Staff:
- Dr. [REDACTED]
- Site Overseer
- High Command Approval
All terminations must be justified in writing and adhere to the strict protocols outlined in Annex 1: Site-96 Operational Directive|Appendix B: Security Clearance Levels}. Failure to comply with these regulations may result in disciplinary action.
Application Denied
Following a comprehensive review of the filed request for de-classification pertaining to Site-96, the Authorization Committee has issued a formal rejection. The causes behind this decision are classified and will not be disclosed at this time. Moreover, any future requests regarding Site-96 will be subject to the same rigorous scrutiny and may result in identical outcomes.
- Respectfully refrain from seeking any illegitimate access to information concerning Site-96.
- All infractions of this directive will be met with disciplinary action.